
Getting Started...
Assessment First Approach
Every CIPP project begins with proper assessment. We recommend CCTV inspection to identify specific issues and determine the most cost-effective rehabilitation strategy for your infrastructure.
Project Planning
Our technical team works with your operations staff to minimize disruption and ensure project success, especially critical for treatment plants and industrial facilities requiring minimal downtime.

OUR PROCESS
Our sustainable solutions are carefully executed. Here is our process, step by step:
1. Infrastructure Assessment
Assess existing conditions using robotic CCTV technology that enters into structures to capture imagery. We use it to diagnose the condition of the infrastructure and make recommendations for remediation.
2. Infrastructure Flushing
Flush infrastructure to remove debris using a high powered flusher truck.

3. Spot Repairs
Complete targeted repairs of infiltration or exfiltration.
4. Corrosion Barrier
Create a barrier using spray-in-place coatings technology (SIPP) to protect and extend the life of existing infrastructure.
OR

5. Structural Lining
Create a structural lining using spray-in-place coatings technology (SIPP) to create a pipe within a pipe should the existing infrastructure be fully degraded.

.png)
