- 01
Trenchless rehabilitation typically costs 30-50% less than full replacement when you factor in excavation, traffic management, restoration, and operational downtime costs. For treatment plants and industrial facilities, the reduced downtime alone often justifies the investment.
- 02
We participate in competitive municipal bidding processes and maintain pre-qualified contractor status with many agencies. Our approach focuses on meeting technical specifications while providing competitive pricing that delivers long-term value.
- 03
We provide comprehensive cost-benefit analyses including lifecycle costs, operational impact, and risk mitigation factors. Our case studies demonstrate quantifiable ROI through reduced maintenance, extended asset life, and avoided replacement costs.
- 04
When properly engineered and installed, rehabilitated pipes often exceed original infrastructure performance. Our solutions are designed with 50+ year service life protocols and can handle the same or greater flow capacity and structural loads as new construction - critical for maintaining operational continuity in municipal systems, industrial facilities, and treatment plants.
- 05
Modern trenchless technology accommodates the full range of infrastructure pipe diameters. Our SIPP solutions handle pipes from 1¼ inch to 72 inches, while our UV-cured CIPP technology rehabilitates pipes up to 32 inches. We'll assess your facility's specific requirements to recommend the optimal approach for your infrastructure portfolio.
- 06
Yes. Our polymeric materials are specifically engineered for harsh industrial environments including chemical processing, mining operations, and oil & gas facilities. SIPP coatings offer exceptional resistance to H2S corrosion, chemical abrasion, and high-temperature applications that challenge traditional rehabilitation methods.
- 07
Every project begins with professional assessment. We recommend CCTV inspection as the starting point to identify specific issues and prioritize rehabilitation needs. This diagnostic approach ensures optimal resource allocation and helps you build a strategic maintenance program.
- 08
Timeline varies by technology and scope. SIPP applications cure in minutes, while UV-cured CIPP offers significantly faster installation than traditional methods. For treatment plants requiring minimal downtime, we can often complete work during scheduled maintenance windows. Industrial facilities benefit from our ability to work around production schedules.
- 09
Trenchless technology's key advantage is minimal operational impact. Most installations require no excavation and can maintain partial system operation. For critical infrastructure like treatment plants and industrial processes, we coordinate closely with your operations team to ensure continuity.
- 10
We maintain COR certification and adapt our safety protocols to meet specific facility requirements including confined space entry, hazardous material handling, and specialized monitoring (carbon monoxide, etc.). Our team includes certified safety managers who work directly with your safety personnel.
- 11
Our rehabilitation materials meet ANSI/NSF/CAN 61 standards for potable water applications and follow AWWA structural classification guidelines. We provide complete compliance documentation for regulatory submissions and environmental assessments.
- 12
We maintain comprehensive commercial insurance, bonding capacity, and professional certifications required for municipal and industrial contracts. Our 33-year track record includes never having a bond pulled or walking away from a project.
- 13
Selection depends on your operational requirements, chemical environment, access constraints, and timeline. Our technical team conducts site assessments and provides engineering recommendations based on your facility's specific conditions and performance requirements.
- 14
We provide complete technical specifications, material certifications, installation procedures, and quality assurance protocols. Our engineering team works directly with your technical staff to ensure all project requirements are met and documented.
- 15
Many facilities start with a smaller-scale project to evaluate our capabilities and build confidence in trenchless technology. We'll identify an appropriate pilot application, provide detailed project planning, and use the results to develop a broader infrastructure rehabilitation strategy.
.png)